Normal view MARC view ISBD view

Comparative financial study between conventional manufacturing system and automated manufacturing system for apparel industry - a case study

by Mizanur Rahman, Md.
Publisher: Dhaka Department of Industrial and Production Engineering, BUET 2019Description: xiii, 59 p.Subject(s): Production management-Ready made garments -- BangladeshOnline resources: Click here to access online
Tags from this library: No tags from this library for this title. Add tag(s)
Log in to add tags.
    average rating: 0.0 (0 votes)
Item type Current location Call number Copy number Status Date due Barcode
Thesis Central Library, BUET
Reference section
658.5095492/MIZ/2019 (Browse shelf) 1 Available 117099

One CD-ROM

Includes bibliograpies

There are no comments for this item.

Log in to your account to post a comment.