000 | 00822nam a22002657a 4500 | ||
---|---|---|---|
001 | 2657 | ||
003 | BD-DhUET | ||
008 | 070821s2006 enka b 001 0 eng | ||
020 | _a9780863414497 | ||
040 |
_aUKM _cUKM _dBD-DhUET |
||
082 | 0 | 4 |
_a623.12136 _bFOX/2007 |
100 | _aFox, Brendan | ||
245 | 0 | 0 |
_aWind power integration _bconnection and system operational aspects _cBrendan Fox ... [et al.]. |
250 | _aIst ed. | ||
260 |
_aLondon _bInstitution of Engineering and Technology _c2007 |
||
300 |
_axii, 276 p. _bill. _c24 cm. |
||
490 | _aIET power and energy series 50 | ||
504 | _aIncludes bibliographies | ||
650 | 0 | _aWind power | |
700 | _aFlynn, Damian | ||
700 | _aBryans, Leslie | ||
700 | _aJankins, Nick | ||
942 | _cGB | ||
856 | 4 | 1 | _uhttp://www.loc.gov/catdir/toc/fy0801/2007532445.html |
999 |
_c2657 _d2657 |