000 | 00726nam a22002177a 4500 | ||
---|---|---|---|
001 | 41213 | ||
003 | BD-DhUET | ||
008 | 180512b xxu||||| |||| 00| 0 eng d | ||
040 |
_c0 _dBD-DhUET |
||
082 |
_a361.1 _bBIS/2018 |
||
100 | _aBiswas, Tarun Kumer | ||
245 | _aFuzzy-based risk assessment methodology for construction project under epistemic uncertainty | ||
260 |
_aDhaka _b Department of Industrial & Production Engineering,( IPE) BUET _c2018 |
||
300 | _axi,51 p. | ||
501 | _aOne CD-ROM | ||
504 | _aIncludes bibliographies | ||
650 | 0 | _aRisk assessment | |
720 |
_aDr. AKM Kais Bin Zaman _eM.Sc. Thesis |
||
856 | _u http://lib.buet.ac.bd:8080/xmlui/handle/123456789/4941 | ||
942 | _cTH | ||
999 |
_c41213 _d41213 |