000 00785nam a22002177a 4500
001 41895
003 BD-DhUET
008 190528b xxu||||| |||| 00| 0 eng d
040 _c0
_dBD-DhUET
082 _a658.5
_bSAK/2019
100 _a Sarker, Alok Kumer
245 _aDevelopment of a preventive maintenance schedule and evaluation of overall equipment effectiveness in a selected garment factory: a case study
260 _aDhaka
_bDepartment of Industrial and Production Engineering, BUET
_c2019
300 _axi, 68p.
501 _aOne CD-ROM
504 _aIncludes bibliographies
650 0 _aProduction management-Ready made garments
720 _aDr. Shuva Ghosh
_eM Sc. Thesis
856 _uhttp://lib.buet.ac.bd:8080/xmlui/handle/123456789/5442
942 _cTH
999 _c41895
_d41895