000 00744nam a22002177a 4500
001 42517
003 BD-DhUET
008 210124b xxu||||| |||| 00| 0 eng d
040 _c0
_dBD-DhUET
082 _a519.536
_bTAZ/2020
100 _aTazim Ahmed, S. M.
245 _aModel for construction schedule and cost prediction using regularized gradient boosted regression tree algorithm
260 _aDhaka
_bDepartment of Industrial and Production Engineering, BUET
_c2020
300 _axiii, 93 p.
501 _aOne CD-ROM
504 _aIncludes bibliographies
650 0 _aRegression analysis
720 _aDr. Ferdous Sarwar
_eM. Sc. Thesis
856 _uhttp://lib.buet.ac.bd:8080/xmlui/handle/123456789/5766
942 _cTH
999 _c42517
_d42517