000 | 00744nam a22002177a 4500 | ||
---|---|---|---|
001 | 42517 | ||
003 | BD-DhUET | ||
008 | 210124b xxu||||| |||| 00| 0 eng d | ||
040 |
_c0 _dBD-DhUET |
||
082 |
_a519.536 _bTAZ/2020 |
||
100 | _aTazim Ahmed, S. M. | ||
245 | _aModel for construction schedule and cost prediction using regularized gradient boosted regression tree algorithm | ||
260 |
_aDhaka _bDepartment of Industrial and Production Engineering, BUET _c2020 |
||
300 | _axiii, 93 p. | ||
501 | _aOne CD-ROM | ||
504 | _aIncludes bibliographies | ||
650 | 0 | _aRegression analysis | |
720 |
_aDr. Ferdous Sarwar _eM. Sc. Thesis |
||
856 | _uhttp://lib.buet.ac.bd:8080/xmlui/handle/123456789/5766 | ||
942 | _cTH | ||
999 |
_c42517 _d42517 |