000 | 00753nam a22002177a 4500 | ||
---|---|---|---|
001 | 44334 | ||
003 | BD-DhUET | ||
008 | 231125b xxu||||| |||| 00| 0 eng d | ||
040 |
_c0 _dBD-DhUET |
||
082 |
_a658.56 _bBIS/2023 |
||
100 | _aBiswas ,Prodip Kumar | ||
245 | _aClustering of barriers and prioritizing of operational parameters for sustainable management of weft-knitting operation | ||
260 |
_aDhaka _bInstitute of Appropriate Technology, BUET _c2023 |
||
300 | _aix,78 p. | ||
501 | _aOne CD-ROM | ||
504 | _aIncludes bibliographies | ||
650 | 0 | _aKnitting machine-Garments-Production | |
720 |
_aDr. Iftheker Ahmed Khan _eMSc Thesis |
||
856 | _uhttp://lib.buet.ac.bd:8080/xmlui/handle/123456789/6864 | ||
942 | _cTH | ||
999 |
_c44334 _d44334 |