DSpace Repository

Browsing Dissertation/Theses - Department of Petroleum and Mineral Resources Engineering by Title

Browsing Dissertation/Theses - Department of Petroleum and Mineral Resources Engineering by Title

Sort by: Order: Results:

  • Fazlul Haque, Md. (Department of Petroleum & Mineral Resources Engineering, BUET, 2003-04)
    Exploration, development and production of natural gas in Bangladesh are of great importancc and playa vital role in our economy. In Bangladesh. exploration activities commenecd from thc bcgiJUling of the nineteenlh ...
  • Enamul Hossain, Mohammed (Department of Petroleum & Mineral Resources Engineering, BUET, 2001-10)
    After the beginning of production, pressure transients propagate outwardly towards the reservoir boundary that changes the pressure around. This introduces the concept of radius of drainage and time to stabilization of ...
  • Rashidul Haque, Md. (Department of Petroleum & Mineral Resources Engineering, BUET, 2000-02)
    Exploration, dc~elopment and production of natural gas in Bangladesh arc of great impNtance and plays vital role In our ewnomy. In Bangladesh exploration activities commenced fT{)m the beginning of the ninteenth century. ...
  • Masud Zaman (Department of Petroleum and Mineral Resources Engineering (PMRE), 2015-04)
    The objective of this project is to find ways to improve efficiency in gas using equipment. At the preliminary stage of the project gas consumption data and Gas Utilization Efficiency Best Practice Data have been collected. The ...
  • Saha, Palash Khanti (Department of Petroleum and Mineral Resources Engineering (PMRE), 2012-04)
    The Bibiyana gas field is one of the most prolific gas fields in Bangladesh. It stared production in March, 2007 with 200 MMSCFD. Production has steadily increased from this field, and currently it is producing more than ...
  • Raihan Hossain, Md. (Department of Petroleum and Mineral Resources Engineering (PMRE), 2013-02)
    For any Environmental Impact Assessment (EIA), Initial Environmental Examination (IEE) is the prerequisite condition. If it suggests furthering clear assessment then EIA is must for that case. The IEE & EIA are the ...
  • Nasimul Islam, Md. (Department of Petroleum & Mineral Resources Engineering, BUET, 2009-05)
    Bangladesh Government has taken a new gas distribution pipeline project titled as "16 DNxl40 Psig 100 Km Gas pipeline network within and around Dhaka City under Dhaka Clean Fuel Project" with the financial assistance of ...
  • Monzurul hoque, Md. (Department of Petroleum and Mineral Resources Engineering (PMRE), 2010-04)
    Our country cannot be developed without any natural resources and energy. In our country natural gas is the primary source of energy. So proper utilization of our natural gas can play vital role and bring economic prosperity. ...
  • Monshof Ali (Department of Petroleum & Mineral Resources Engineering, BUET, 2007-05)
    Gas TraIlllITllssion Company limited (GTCL) was incorporated in 1993 in the unbundling process of gas sector restructuring for owning, operating and maintaining the high pressure gas transmission pipelines forming a part ...
  • Prodip Kumer Chowdhury (Department of Petroleum and Mineral Resources Engineering (PMRE), 2010-04)
    Eastern Refinery Limited is the only Petroleum Refining Company in Bangladesh which was established in 1968. Its installed capacity is 1.5 million MT. But now it can hardly process 1.3 million MT due to its aging effect. ...
  • Sanwar Hossain, Mohammad (Department of Petroleum & Mineral Resources Engineering, BUET, 2007-12)
    The gas fields in Bangladesh discovered so far discovered arc located in the Eastern Part of the country. As a result gas based power plants, fertilizer factories and industries have been set up only in the Eastern Part ...
  • Kamruzzaman, A. B. M. (Department of Petroleum & Mineral Resources Engineering, BUET, 2008-11)
    Greater application of alternati '" fuels like eNG for transportation systems hru:;been encouraged and supported by l!angladesh Government. A small reductic," in fuel consumption through use of alternate cheaper fuel, ...
  • Gul Nahar (Department of Petroleum & Mineral Resources Engineering, BUET, 2000-11)
    Pmduction data for many gas condensate pl'Oducing wells all over the world have shown thaI the productivity is severely cUJtailed when the flowing bottom-hole pressure is less than the saturation (dew point) pressure of ...
  • Islam Miah, Mohammad (Department of Petroleum and Mineral Resources Engineering (PMRE), 2014-11)
    Formation evaluation can be performed in several stages such as during drilling, after logging as detailed log interpretation, and core analysis in the laboratory, etc. This study shows the formation evaluation using ...
  • Golam Sarwar, Md. (Department of Petroleum & Mineral Resources Engineering, BUET, 2007-04)
    Titas Gas Transmissiun & Distribulion Co. LId., a company 01' l'elrobungla wllieh is the largest di~lribulion imd markeli~g company of Bangladesh (72% market share) distributes and market~ natural ga, in Dhaka City and ...
  • Shahidul Alam, Mohammad (Department of Petroleum & Mineral Resources Engineering, BUET, 2002-05)
    Habiganj gas field is located approximately 75 miles north of Dhaka in cast-central BMgladcsh. It is perhaps the second largest gas field in Bangladesh after Titas. Therefore, it is extremely important to estimate the ...
  • Enamul Kibria, Md. (Department of Petroleum and Mineral Resources Engineering (PMRE), 2016-10)
    With rapid growth of national economy and strong social needs, energy has become an important strategic resource for national development. Although Bangladesh government is making great efforts to develop sustainable ...
  • Das, Avijit (Department of Petroleum and Mineral Resources Engineering (PMRE), 2013-10)
    In Bangladesh gas is being used for different purposes but the entire country is now suffering from gas shortage. There is now almost 500 MMCFD gas shortage in the national grid. According to Petrobangla Report, shortfall ...
  • Siddiqur Rahman, Md. (Department of Petroleum & Mineral Resources Engineering, BUET, 2007-12)
    Safety is the top most priority in Titas Gas Transmission and Distribution Company Limited (TGTDCL) which ensures unintenupted supply of natural gas (NG) in greater Dhaka, Mymenshing and Brammanbaria. It is related to ...
  • Mizanur Rahman, Md. (Department of Petroleum and Mineral Resources Engineering (PMRE), 2015-11)
    An integrated reservoir characterization technique is used to integrate the geological, engineering and reservoir performance data to describe the reservoir and to develop an appropriate reservoir management plan. This ...

Search BUET IR


Advanced Search

Browse

My Account