Biswas, Ashoke Kumar
(Department of Petroleum and Mineral Resources Engineering (PMRE), 2011-04)
The Bakhrabad-Chittagong (BKB-CHT) high pressure gas transmission line was first commissioned in 1983. It is a 175 km long, 24" dia, 960 psig) gas pipeline which was built to supply gas from the Bakhrabad Gas field, ...