DSpace Repository

Evaluation of appropriateness of the technology used in Khulna - Jessore drainage rehabilitation project

Show simple item record

dc.contributor.advisor Kamal Uddin, Dr. M.
dc.contributor.author Rowshon Ara
dc.date.accessioned 2015-11-21T10:47:40Z
dc.date.available 2015-11-21T10:47:40Z
dc.date.issued 2009-02
dc.identifier.uri http://lib.buet.ac.bd:8080/xmlui/handle/123456789/1276
dc.description.abstract The objective of the present research aims at assessment of appropriateness of technology that was used in Khulna-lessore Drainage Rehabilitation Project (KJDRP). The project area is characterized by sediment laden tidal rivers having some major problems over recent years such as drainage congestion, fboding and salinity etc .. causing a declinc in agricultural production and olher socio-economic anomalies. KJDRP "'as implemented to mitigate drainage, salinity and other problems with an aim lO rcduce poverty through greater employment in the agriclllturc and increased agricultuwl production in the project arca. In this research. thc technology that was used in KJDRP was cvaluated using threc models/methods: i) Analytical Hierarchic Process (AHP) ii) Fuzzy Hicrarchical Decision Making Method (FHDM) and iii) Field Survey and Focus Group Discussion (FGD). The objective is to make an application of the (Multi nitcria Decision Making) MCDM model to evaluate whether the technology used in KJDRP is appropriate or not for that very particular surrounding environment. because technology is very surrounding specific. !'rom AHP method, result shows that the lotal score for KJDRP is 596 where score for Non-KJDRP is 173, Thus in AI.I? mdhod. KJDRP got 1st ranking value and i-loll-KJDRP got 2,d ranking value. In Funy method. the [esult shows that KJDRP option scored I" in preferential ranking \'alue wh~re Non-KJDRP option scored 2,d ranking value. From Focus Group Discussion (FGD) and Field Survey, it is e~ident that the perlormance of criteria under KJDRP opti')ll i.1posithe and it scored 2216.5 in thc scale range trom (-) 4080 to (+) 4080. Howc,"er from threc analytical points of views, KJDRP got highe'.t value \\hich indicales lhat KJDRP with its performance was appropriate to reduce thc existing water logging problem and to encourdge the socio-economic development of thc project area, KJDRP is suc~essful in the~e few prime objectives of the project. A ,et of recommendations enaminated evolved based on the research result: i) Action is required to be takcn for restoration of the Hamkura river and development of J"RM for improvement of the drainage condition. ii) Implementation of a new 1'&\1 in the Khubia beel is required to be taken up or continue the existing beel Kedariu TRM for su,taining dminage condition of the Hari River. The east Khuksia beel is feasible for TRM and would be more eITective to maintain proper drainage condition in the Had river. Thc west Khuksia is also tc<:llllically feasible for aeting as a tidal basin but it required more land than that of east bcel Khuksia. It generates more than 4.87 Mm3 xviii tidal volwne, which is considerably higher than the required tidal volume for the sustainability of the Harl river. iii) to restore the full function of the beel Kedaria TRM and sustain the required drainage capacity of the Hari river, it is suggested to dredge the Hari river al its design capacity of the Hari river at its design section from Bhabodaha regulator to Sholgmi (about 9 km reach). iv) in order to maintain proper drainage capacity of the Hari river & to avoid severe drainage congestion in the North-Western parlor the KJDRP area, east beel khuksia needs to be brought under operation as a tidal basin_ It is technically feasible and socially acceptable. v) it is suggested 10 dredge the Teka-hari ri,-er at it> design section from 600m uls of Teka Bridge to Ranai (ahout 17 km reach). vi) A continuous monitoring is necessary for assessment of new tidal basin. identification of problems ofmitigmion measures. Opinion from some of the experts who think that TRM (ridal River Management) as a part of KJDRP is not appropriate technology_ According to them, it is useless to enlighten a village by thro"ing the remaining village in darknes>, Why the people in lhe heel area will be deprived for three years during the operation period of the beels, and who \vill pf()vide their compensation for that time period'? Establ ishmen! of regul ator in lhe narroe channel must fC>Ullin failure due to lower velocity of the waler and siltation caused by it They suggested that regulator in Madhukhali or further down~tream mther than the narrow chmmel will be dTective as it join, the large river and will prevent siltalion due to huge 110v,'of water. They propose that Hari river can join Dakatia ri,a lhrough a canal networking and thus drainage from Hari river is possible through Shl'lmari regulator. The tedUlology used in KJDRP didn't consider the importance of \vetl,md But wetland 15 very ewci,,1 for sustenance of the ecosystem of fisherie~_ So what is needed is to proper management of the wetland. Regl.llatm in MadhukllUli can be ~ belleI' option, as it will prevent saline water intrusion during tidal period when the gate is closed, on the other hand. it "ill drain excess river "'ater during monsoon, ami lhus will remOVe the drainage problem and at the same time. will maintain minimum water l"orsustenance of the wetland. Implemcntation of this option may require high inilial COqdue to dredging requirement, hut still it seems to be minimum when compared with the huge cost involved due to operation of TRevl in a single beel. However, TRM considers siltation in wetlands with a view to keep the river navigable and to grow more food concept. Thus in thc present analysis, it is successful and appropriate ".,;th the targel fixed by it. en_US
dc.language.iso en en_US
dc.publisher Department of Institute of Water and Flood Management (IWFM) en_US
dc.subject Drainage congestion - Khulna - Jessore Area en_US
dc.title Evaluation of appropriateness of the technology used in Khulna - Jessore drainage rehabilitation project en_US
dc.type Thesis-MSc en_US
dc.contributor.id 0428033 MF en_US
dc.identifier.accessionNumber 107225
dc.contributor.callno 627.540954925/ROW/2009 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search BUET IR


Advanced Search

Browse

My Account