Abstract:
Bangladesh IS one of the lest developed countries llnd its
textile sector has been declared as "thrust sector" for
industrial development. Creation of necessary backward linkage
by establishing sophisticated spinning mill is the precondition
to achieve the economic goals through developing the Textile
Sector.
End down or end breakage is one of the major problems that
reduces production and increases labour cost of spinning mills.
End breakage is an unavoidable phenomena during spinning and
accordingly a number of manpower is engaged to eliminate end
breakage by piecing up the broken ends. The number of side(s)
to be allocated per tenter (labour) at any end breakage rate
has been introduced in spin plan (determination of optimal
number of machines and accessories in all sections of spinning
mi 11) •
Spin plan is an essential but laborious and time consuming
task. To overcome the constraints a computeri:;:ed method has
been developed for spin plan which requires least time to
provide almost all required features.
A table has been prepared under the title "Ring Production
Table (RPT)"' containing some essential techno-managerial
indexes and instantaneous vivid features of ring production
data and also shows among others (interalia) the optimal labour
norm against the ring frames, revenue generation per day etc.