DSpace Repository

Evaluation of the scada system in GTCL

Show simple item record

dc.contributor.advisor Rahman, Dr. Mohammed Mahbubur
dc.contributor.author Monshof Ali
dc.date.accessioned 2015-12-08T03:36:56Z
dc.date.available 2015-12-08T03:36:56Z
dc.date.issued 2007-05
dc.identifier.uri http://lib.buet.ac.bd:8080/xmlui/handle/123456789/1481
dc.description.abstract Gas TraIlllITllssion Company limited (GTCL) was incorporated in 1993 in the unbundling process of gas sector restructuring for owning, operating and maintaining the high pressure gas transmission pipelines forming a part of the natiolUl! gas grid. Around 70% of total produced gas is transmitted by GTeL pipelines. In order to ensure smooth and efficient pipeline operation, it was dedded to incmporate a Supervisory Control And Data Acquisition (SCADA) system by GTCL. It was dnly installed and commissioned in 2004. The main objective of this study is to frod out the reai impacts of the SCADA system. This is done by carefully studying and itemizing the tangible and intangible benefits directly arising out of the SCADA system. Shortcomings are also identified which need to be removed in order to get maximum benefits from the SCADA system. Financial analysis is performed from two perspectives such as-gas sector perspective and national perspective to justify the implementation of the system. The froancial parameters of gas sec10r perspective reveal that the project is not financially viable while it is viable for national perspec1ive. en_US
dc.language.iso en en_US
dc.publisher Department of Petroleum & Mineral Resources Engineering, BUET en_US
dc.subject Gas distribution - Natural gas - Bangladseh en_US
dc.title Evaluation of the scada system in GTCL en_US
dc.type Thesis-MSc en_US
dc.contributor.id 100113009 P en_US
dc.identifier.accessionNumber 104546
dc.contributor.callno 665.74095492/MON/2007 en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search BUET IR


Advanced Search

Browse

My Account