dc.contributor.advisor |
Abdullahil Azeem, Dr. |
|
dc.contributor.author |
Raihanul Haq, MD |
|
dc.date.accessioned |
2017-07-22T05:10:27Z |
|
dc.date.available |
2017-07-22T05:10:27Z |
|
dc.date.issued |
2016-10 |
|
dc.identifier.uri |
http://lib.buet.ac.bd:8080/xmlui/handle/123456789/4541 |
|
dc.description.abstract |
Productivity is very important to every industry because it helps a company respond quickly to customer demand as well as to optimize the resource usage, which is an important issue
of competitive strategy. High productive rate can help a company to complete the production
cycle in a much shorter time than it would otherwise be possible. Utilizing the allocated
resources properly lead to better productivity and enhance the efficiency as well as
effectiveness.
Grid are considered the core & the heart of the battery industry. So focusing on that to
improve its productivity is the main concern. Productivity in casting is a very important
measure in manufacturing operations as well as it contributes in turnover & profit, besides it
provides insight into the efficiency & effectiveness of operations. Improved efficiency bears
a positive impact on the direct costs of products of a company, as same output is produced
consuming less input or provides same inputs to produce more output.
Considering the incredible demands on tight schedule, no activity is worth doing unless it
promises to add value to the central part of an operators work and make it more successful
and satisfying. However, a problem remains in industries to identify appropriate method to
achieve that. Thus, selecting a focus, the first step in the process & it is vitally important.
Kaizen events are sometimes referred to as rapid improvement events. It involves small
groups of individuals in the company that are brought together to address a particular area of
the company.
The present study focuses on improving grid casting productivity and reducing the problems
related to low productivity and efficiency. Other sections regarding plate preparation are also
highlighted for observation. Capacity study of individual processes and production
procedure will be considered for improvement. |
en_US |
dc.language.iso |
en |
en_US |
dc.publisher |
Department of Industrial and Production Engineering (IPE) |
en_US |
dc.subject |
Productiion management-Battery manufactiing company |
en_US |
dc.title |
Productivity improvement of GRID casting in a battery manufacturing company-a case study a case study |
en_US |
dc.type |
Thesis-MSc |
en_US |
dc.contributor.id |
1014082104 F |
en_US |
dc.identifier.accessionNumber |
115053 |
|
dc.contributor.callno |
658.5/RAI/2016 |
en_US |