Fariha Azam
(Department of Civil Engineering, 2014-05)
The main objective of the research was to evaluate the prospect of tunnelling by Cut and Cover as well as New Austrian Tunnelling Method (NATM) through conventional and numerical study for underground metro rail system in ...